Product Description:
1. Product Introduction:
The Mh type fully enclosed box "U-shaped brush" electric single beam gantry crane is used in conjunction with a hoist. It adopts steel pipe legs and has a small windward side, making it a lightweight door product for outdoor and windy areas. It has two operation modes: air operation and ground operation. Lifting capacity Gn=2t-20t, span 10m -30m, working environment below 40 ℃, working level 25%, wind pressure not exceeding 125Pa.
2. Technical features:
The transmission adopts a new generation three in one system, and the electrical appliances are controlled by contactless module speed regulation, which can achieve micro speed and dual speed proximity frequency conversion functions, making the operation and lifting performance particularly smooth. It is equipped with overload alarm and inclined products, secondary protection against hook impact, overcurrent protection for missing items, etc. The control panel (handle) adopts 12V voltage to achieve multifunctional protection for the hoist door crane. When the voltage is within 380V+5-10%, the electronic control can be used for a long time up to "2 million" times.
3. Selection principle:
Industry usage, start-up, jog times/h, practical time per day h Please specify: lightweight crane. Start and jog at Gn/10-80 times/h Gn/2-40 times/h Gn/1-15-20 times/h, high temperature of 50 ℃ and harsh environment times/h ÷ 2.
4. Precautions:
① At the work site, when the crane stops working, the user should promptly lock the crane.
② The main switch of this crane is not equipped with any wires. It is strictly prohibited to use it for lifting high-temperature molten liquids, flammable, explosive, corrosive, overloaded, dust and other hazardous operations.
③ The total length of the external suspension of the gantry crane is less than 1/3 of the span, and 90% of the Gn limit at the external suspension is reached. The heavy object must be moved and supported to drive the large vehicle inside before it can operate. The weight Gn that needs to be reduced by 10-20% when the large vehicle is running outside the legs, and when the overhang exceeds 1/3 of the mid span, Gn should be reduced in sections. In the above situation, heavy objects must be close to the supporting leg of the large vehicle before they can be operated. Small spans should not run outside the legs.
Previous:QY type insulated double beam bridge crane | Next:Qualification and Honor |